At the San Javier Project today there is a mill, crusher, floatation circuit and laboratory.
There are two small rivers running in close proximity to the mill site, that provides adequate water supply, yet are far enough away not to disturb mining operations.
Excellent transportation infrastructure is already in place; logging roads provide safe access to and from the property.
Past Producing Mine: has excellent existing infrastructure (water, electricity, roads) required to enable an expeditious return to production.